Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 147: 2009-001-00 EXP UC SPRING CHINOOK & STEELHEAD ACCLIMATION
Project Number:
Title:
Upper Columbia Spring Chinook and Steelhead Acclimation
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Methow 50.00%
Wenatchee 50.00%
Contract Number:
56662 REL 147
Contract Title:
2009-001-00 EXP UC SPRING CHINOOK & STEELHEAD ACCLIMATION
Contract Continuation:
Previous: Next:
56662 REL 120: 2009-001-00 EXP UC SPRING CHINOOK & STEELHEAD ACCLIMATION
  • 56662 REL 173: 2009-001-00 EXP UC SPRING CHINOOK & STEELHEAD ACCLIMATION
Contract Status:
Closed
Contract Description:
This acclimation project proposes to further develop acclimation for upper Columbia steelhead and spring Chinook by developing new semi-natural ponds similar to what has been uniquely successful in the Mid-Columbia Coho Restoration Project (BPA Project #1996-04000). This would involve utilizing the existing PUD/Federal mitigation production in the region that is currently doing either direct stream plants or single point, large releases and expand/refine those releases by adding additional acclimation releases in known habitat reaches within the Wenatchee and Methow watersheds. This strategy will enhance the goals of recovery for these 2 listed stocks.

For the FY18 contracting period, one of the main objectives will be to continue moving ahead with the comprehensive plan presented to various committees and agencies, which has been accepted generally. The main placement of this program is to maximize spring Chinook distribution in the upper Methow where adult management is in place and being implemented to restrict/reduce hatchery influence and more importantly reduce the effects of a single source release location, which YN identified in the UCSCSA original plan. Currently, restrictions to the numbers being released in the upper Methow are due to the uncertainties of whether these decreases in productivity form the egg-to-emigrant life stage is due to super saturation in the reaches near Methow SFH and Winthrop NFH, hatchery contributions that are driving down reproductive success or a combination of both. So, for 2018 releases will occur only at Goat Wall for a second consecutive year.  Chewuch AF will still be used for acclimation of spring Chinook, just no longer under this contract.  Steelhead in the Methow are being planned for release either from future Goat Wall releases, Early Winters, Mid Valley Pond and/or Gold Creek Ponds.

For the Wenatchee, focus in on steelhead acclimation in Nason Creek. The Powerline site will alleviate the lack of acclimated rearing needed for these species and get away from the current direct planting strategy.

Primarily activities for this contract will revolve around several key items:

- NEPA and SEPA for the project was completed in the previous contract and now working towards 404 and 401 requirements and well as state and county permits required.  ESA consultations are also completed. Processing permits for Powerline construction and continuing to develop release numbers at various sites and get HCP and PRCC committee approval.
Account Type(s):
Expense
Contract Start Date:
02/01/2018
Contract End Date:
01/31/2019
Current Contract Value:
$282,209
Expenditures:
$282,209

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Contract Manager kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Eric McOmie Bonneville Power Administration Yes Interested Party ermcomie@bpa.gov (503) 230-4964
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Technical Contact murk@yakamafish-nsn.gov (509) 548-2206
Jackie Olney Yakama Confederated Tribes No Administrative Contact olnj@yakamafish-nsn.gov (509) 865-5121x6311
Thomas Scribner Yakama Confederated Tribes Yes Supervisor scrt@yakamafish-nsn.gov (503) 331-9850
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
If needed, Update 2012 UCSCSA plan as needed for new sites towards implementation B: 174. Update UCSCSA Plan as sites become identified as part of the implementation schedule 01/31/2019 01/31/2019
Final To Date Site List compliance for acclimation C: 165. Final site list compliance for acclimation 01/31/2019 01/31/2019
Effective implementation management and timely contract administration D: 119. Manage the UC Spring Chinook and Steelhead Acclimation Project 01/31/2019 01/31/2019
Stakeholder Coordination E: 191. Coordination of Plan with Regional Stakeholders 01/31/2019 01/31/2019
Annual report to cover activities from 2/1/18 to 1/31/19 F: 132. Annual synopsis report for 2018 contract year; developed as a technical memo or summary. 01/31/2019
PIT tag spring Chinook G: 158. PIT tag up to15K spring Chinook in the Methow basin for 2019 releases 11/01/2018 11/16/2018
Acclimate spring Chinook spring 2018. H: 176. Acclimate spring Chinook at Goat Wall Pond 05/15/2018 05/07/2018
Completed construction of Powerline site I: 171. Development/Construction of Powerline acc. site for Wenatchee program steelhead 01/31/2019
Completion of Trinity as an over-winter/acclimation site in the Chiwawa basin J: 171. Develop additional site in the Wenatchee for spring Chinook-Trinity 01/31/2019
Construction Management Complete K: 100. Construction management for Powerline site 01/31/2019
Annual report to cover activities from 2/1/15 to 1/31/16 L: 132. Annual synopsis report for 2015 contract year; developed as a technical memo or summary of findings 03/01/2018 03/01/2018
Annual report to cover activities from February 2016 to January 2017 M: 132. Add FY 2016 report 10/26/2018 12/14/2018
Annual report to cover activities from 2/1/17 to 1/31/18 N: 132. Annual synopsis report for 2017 contract year; developed as a technical memo or summary of findings 01/25/2019 01/31/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2018
B 174 Update UCSCSA Plan as sites become identified as part of the implementation schedule 12/20/2017
C 165 Final site list compliance for acclimation 02/01/2018
D 119 Manage the UC Spring Chinook and Steelhead Acclimation Project 02/01/2018
E 191 Coordination of Plan with Regional Stakeholders 02/01/2018
F 132 Annual synopsis report for 2018 contract year; developed as a technical memo or summary. 02/01/2018
G 158 PIT tag up to15K spring Chinook in the Methow basin for 2019 releases 12/20/2017
H 176 Acclimate spring Chinook at Goat Wall Pond 12/20/2017
I 171 Development/Construction of Powerline acc. site for Wenatchee program steelhead 12/20/2017
J 171 Develop additional site in the Wenatchee for spring Chinook-Trinity 12/20/2017
K 100 Construction management for Powerline site 02/01/2018
L 132 Annual synopsis report for 2015 contract year; developed as a technical memo or summary of findings 02/01/2018
M 132 Add FY 2016 report 02/01/2018
N 132 Annual synopsis report for 2017 contract year; developed as a technical memo or summary of findings 02/01/2018